Road Resurfacing & Reconstruction for Developers

We deliver Section 38-ready road resurfacing and reconstruction with fixed-fee backlog defect resolution. Your scheme exits on schedule, not 18 months late with hidden liabilities.

Specialist resurfacing for developers managing Section 38 adoption and defect backlogs

You’re 18 months past practical completion. The road should’ve been adopted. Instead, you’re fielding defect notices from the council, your capital’s locked up, and you can’t exit the scheme.

Sound familiar? It’s the same story playing out across thousands of developments. Roads built “to spec” that won’t pass final inspection. Defect liability periods that never end. Bonds that never get released.

Get your roads adopted and release your capital

You need roads that actually meet adoptable standards, not just tick boxes on a technical approval that nobody checked properly during construction.

We deliver this across the South West, South Wales, and the Thames Valley. From initial defect surveys through reconstruction and 12-month maintenance to final certificate. Fixed-fee packages that give you cost certainty, not open-ended liability.

We’re NHSS accredited with ISO 9001, ISO 14001, and ISO 45001. We’ve managed hundreds of Section 38 and Section 278 schemes through final adoption.

What we can deliver for your site...

Why development roads fail adoption, and why it destroys your ROI

The construction shortcuts that create adoption nightmares

You need roads that actually get adopted...

Roads built right so adoption happens on schedule. Fixed-fee certainty, not open-ended liability

Fixed-fee adoption packages:

We quote one price covering all defect resolution, maintenance, inspections, and documentation through final certificate. You know your total cost upfront.

Timeline certainty:

Most backlog schemes signed off within 12-18 months of engaging us, versus the three-plus years you've already spent. We give you a programme and stick to it.

Roads that pass inspection first time:

Twenty-five years managing Section 38 adoptions means we know exactly what every council inspector checks. Built to those standards from day one.

Your capital released faster:

Schemes exit on schedule. Bonds released. Liabilities transferred to the council. You move onto the next development instead of firefighting the last one.

One invoice, one partner:

We manage everything - surveys, design, construction, traffic management, council liaison, resident communication, final documentation. You're not coordinating five contractors.

Maintenance period handled:

The 12-month defect liability period after resurfacing? We manage it. Inspections, reactive repairs, winter maintenance, documentation. Covered in the fixed fee.

The Google logo is displayed above five gold stars in a row, representing a five-star rating for commercial car park surfacing or a high review score. | Highways Plus

Why developers and main contractors choose Highways Plus

You need a partner who understands that adoption isn’t just a technical process – it’s a commercial imperative. Every month your scheme sits unadopted is another month your capital’s tied up earning nothing whilst holding costs compound.

What sets us apart

We know every council’s inspection process, every common failure mode, every objection you’ll face. Been there, fixed it, documented it.

Transparent pricing covering all rectification work, maintenance period, and documentation. Change control only for genuine scope changes, not gaps in our understanding.

We’ll tell you whether reconstruction or resurfacing actually solves your problem. We’ll explain ROI impact, not just structural coefficients.

ISO 9001 quality, ISO 14001 environmental, ISO 45001 safety, NHSS highway compliance. Every certification councils check when deciding whether to trust your contractor.

We deliver schemes councils trust. Technical approvals process smoother, inspections faster, disputes rare. Reputation matters when you need final sign-off.

Dedicated project management tracking every defect, every inspection, every piece of documentation required for final certificate. You get monthly progress reports, not radio silence.

A clear, structured process that gets schemes adopted

Road adoption needs methodical defect resolution, compliant construction, rigorous quality control. Full documentation at every stage.

What you get...

Most backlog schemes follow phased delivery – defect survey establishing full scope, followed by rectification works, then 12-month maintenance period with regular inspections.

Typical timelines: 12-18 months from survey to final certificate for standard housing developments, 18-24 months for complex schemes with structural issues, 8-12 months for schemes needing only minor defect resolution.

1.

Defect survey and adoption assessment:

We walk your scheme with the council's adoptable standards checklist. Every defect photographed, measured, categorised. You get a written report detailing what needs fixing and estimated cost.

2.

Fixed-fee proposal and programme:

Transparent quotation covering all rectification, traffic management, residents' liaison, maintenance period, final documentation. Programme showing realistic timelines for council liaison and approvals.

3.

Rectification works and quality assurance:

Defects resolved to adoptable standards. Nuclear density testing, core sampling, material certification. Every test witnessed by council inspectors if required, zero disputes at final inspection.

4.

Maintenance period management (12 months minimum):

We handle inspections, reactive repairs, seasonal maintenance, resident complaints. Monthly reporting. Everything documented for final certificate submission.

5.

Final certificate and bond release:

Submission of as-builts, test certificates, maintenance records, photographic evidence. Council issues Part 3/Final Certificate. Your bond gets released. Liability transfers. Done.

80-home development, Bristol - backlog defect resolution

A magnifying glass icon focuses on a warning triangle with an exclamation mark inside, set against a bright green circular background—ideal for highlighting commercial car park surfacing alerts. | Highways Plus

The Challenge:

Icon of a person wearing a hard hat and suit next to a cog, symbolising engineering, technical work, or commercial car park surfacing project management, on a bright green circular background. | Highways Plus

Our Solution:

A dark green bullseye target with an arrow in the centre, set against a bright lime green circular background—ideal for highlighting precision in commercial car park surfacing. | Highways Plus

The Outcome:

Proven delivery of road resurfacing across diverse sectors

Whether you’re developing housing, commercial, industrial, or mixed-use schemes, you need confidence that your roads will actually pass inspection and get adopted.

Sectors that rely on us:

  • Housing estates requiring Section 38 adoption of internal roads and Section 278 works for site access. Fixed-fee adoption management accelerating scheme exit and capital release.
  • Managing road construction and adoption on behalf of developers. Reliable delivery protecting programme and reputation with client and local authority.
  • ffordable and mixed-tenure schemes balancing quality requirements with budget constraints. Cost-effective solutions meeting adoptable standards without gold-plating.
  • Business parks and logistics sites requiring heavy-duty specifications for HGV traffic. Roads built to actual usage requirements, not minimum standards.
  • Complex schemes with public realm, highways alterations, and private drives. Integrated design and adoption management across multiple interfaces.

Road improvement schemes, junction upgrades, active travel routes requiring Section 278 coordination and adoptable surfacing. Professional delivery meeting highway authority expectations.

18-36 months is typical from practical completion for straightforward schemes. Backlog schemes where defects exist can take three-plus years without specialist intervention. Our fixed-fee adoption service typically achieves final certificate within 12-18 months of engagement by managing the entire process methodically.

Resurfacing replaces the top wearing course (typically 40-60 mm) whilst preserving existing base layers. Used when structural integrity is sound but surface shows wear. Reconstruction removes all layers down to subgrade and rebuilds from foundations up. Required when structural failure, settlement, or inadequate original specification means surface repairs won’t solve underlying problems.

Standard overlay resurfacing: £50-£70/m² depending on specification and project size. Heavy-duty commercial spec: £60-£90/m². Full reconstruction: £90-£120/m². Section 38 adoption management typically adds £15,000-£30,000 fixed fee depending on scheme complexity and defect extent.

Defect survey and council liaison, all rectification works to adoptable standards, traffic management, residents’ communication, 12-month maintenance period including inspections and reactive repairs, final documentation and as-builts, submission to council for final certificate. Excludes only genuine unforeseen ground conditions not identifiable through reasonable investigation.

Yes. This is common. We survey the scheme against adoptable standards, identify all defects preventing adoption, provide fixed-fee quotation for rectification. We don’t need the original contractor’s cooperation or documentation – we work with what’s there and what the council requires for sign-off.

We minimise disruption through phased delivery, temporary access arrangements, advance communications, and flexible scheduling. Typical residential street resurfaced in 2-3 days. Larger schemes delivered one phase at a time so most of the estate remains accessible. Night working available for operational sites requiring 24/7 access.

Yes. Many developments require both – Section 38 for internal estate roads, Section 278 for works affecting existing highway (new junctions, visibility splays, footway crossings). We manage both simultaneously with integrated traffic management and coordinated adoption processes.

Our fixed-fee proposal is based on agreed scope with the council’s highways officer. If genuinely new requirements emerge that weren’t identifiable at survey stage, we discuss options with you before proceeding. Changes to council policy or previously undisclosed requirements are managed through transparent change control, not hidden in vague contingencies.

Defect survey scheduled within one week of request. Survey report and fixed-fee proposal typically delivered within 10 working days. Mobilisation for rectification works: 2-4 weeks depending on traffic management approvals and material lead times. Emergency works for safety-critical defects can mobilise within 48 hours.

Book a Free, No-Obligation Adoption Assessment
Book a Free, No-Obligation Adoption Assessment

Stuck with a scheme that won't get adopted?

We’ll survey your development, identify every defect preventing final certificate, assess timeline to adoption, provide a written report with fixed-fee quotation.

No obligation, no sales pressure – just expert advice from specialists who’ve managed hundreds of Section 38 adoptions through final sign-off across the South West, South Wales, and Thames Valley.

Call or fill out our form and we'll be in touch within 24 hours.

Commercial surfacing and construction

Latest surfacing and civil's advice and news

Ready to discuss your project?

Complete the form below to speak to a specialist about your requirements or call us on 01761 202 012