...

Signage & Road Marking Installation

Clear, compliant markings and signage meeting TSRGD and BS EN 1436 standards. Thermoplastic installation that lasts, Chapter 8 traffic management included, NHSS-accredited team.

NHSS-accredited marking and signage for councils, developers, and highway authorities managing safety-critical infrastructure

Faded road markings contributed to 1,624 UK road fatalities last year.

Twenty percent of A-roads and motorway sections now have markings below minimum standards. Residents are complaining. Councils are responding. And poor visibility at junctions is causing accidents that could’ve been prevented.

Signage and road marking installation and signs that stay visible when it matters

You need infrastructure that drivers can see in wet conditions, at night, in fog. Markings that don’t fade to nothing within three years, forcing another round of emergency works and traffic management costs.

We deliver this across the South West, South Wales, and the Thames Valley. From initial surveys and NRSWA permitting through to thermoplastic installation and compliance documentation.

What we can deliver for your site...

Why road markings fail early, and why that costs you more

The technical reasons markings disappear

There's a specification that solves this...

Markings that last through heavy traffic, wet weather, and years of UV. Thermoplastic as the default, not the upgrade

12-20 year service life:

Thermoplastic markings lasting 6-10 times longer than paint, even under heavy traffic. Fewer reinstallations, lower lifecycle costs, less disruption.

Retroreflection that stays compliant:

BS EN 1436 RL3/RL4 performance maintained throughout lifespan. Glass bead application delivering 200+ mcd at installation, staying above 100 mcd after 36 months.

Wet-night visibility included:

Modern RW-class performance keeping markings visible in rain, fog, spray. Drivers see junctions and lanes when conditions turn dangerous.

Traffic management done properly:

Chapter 8-compliant systems with correct advance warning zones, lead-in tapers, safety buffers. NRSWA permits sorted, Street Manager documentation handled.

Fixed-fee options available:

Transparent pricing covering surveys, permits, surface prep, installation, testing, documentation. You know costs upfront, not after discovering problems mid-job.

Full compliance documentation:

Performance testing at 12, 24, 36 months, reflectometry results, as-built records, NRSWA closure paperwork. Everything for your asset management systems and inspections.

The Google logo is displayed above five gold stars in a row, representing a five-star rating for commercial car park surfacing or a high review score. | Highways Plus

Why highway authorities and councils choose Highways Plus

You’re managing tight budgets and safety obligations. You need a contractor who understands that road markings aren’t cosmetic—they’re safety-critical infrastructure that prevents accidents and saves lives.

What sets us apart

We’re approved to work on strategic road networks. ISO 9001, 14001, 45001 certified. The accreditations councils need for contract compliance.

We push thermoplastic over paint because it’s the right long-term solution. 12-20 year lifespan versus 2-5 means you’re not back out three years later spending again.

  1. Chapter 8 systems, NRSWA permits, Street Manager applications. You’re not coordinating separate contractors or managing interface risks.
  1. Retroreflectometry at installation and throughout lifespan, performance verification against BS EN 1436, as-built records in CAD/GIS. Full compliance audit trail.

High-contrast signage, tactile elements, accessible crossing markings. Equality Act requirements satisfied without bolting them on afterwards.

Know your costs before approving programmes. Transparent pricing, clear change control for genuine discoveries, not gaps in our scope.

A clear, structured process that keeps roads safe and operational

Road marking projects need thorough surface prep, compliant traffic management, methodical installation. Quality control at every stage.

What you get...

Most projects run through phased delivery—surveys and permits first, establishing full scope before road closures begin.

Typical timelines: 2-4 weeks for straightforward junction improvements, 4-8 weeks for major route remarking programmes, 1-2 weeks for emergency safety-critical works.

1.

Site surveys and specification:

Topographical surveys, existing marking assessment, traffic volume analysis. You get detailed specs covering materials, performance standards, traffic management requirements before we quote.

2.

Permits and approvals:

NRSWA applications via Street Manager, traffic regulation orders where needed, utility diversions coordinated. All statutory approvals secured before mobilisation.

3.

Surface preparation and testing:

Legacy marking removal, pressure washing, moisture content testing. Surfaces meeting adhesion specifications, zero shortcuts that compromise lifespan.

4.

Installation with quality control:

Thermoplastic heated to specification (200°C monitored continuously), glass beads applied immediately for retroreflection, thickness measured during application. Chapter 8 traffic management maintaining safety throughout.

5.

Testing and documentation:

Retroreflectometry at installation (200+ mcd verified), performance testing schedule established (12/24/36 months), as-built records provided, NRSWA closure completed. Full compliance audit trail delivered.

Road marking installation CASE STUDY

Major junction remarking programme, Somerset

A magnifying glass icon focuses on a warning triangle with an exclamation mark inside, set against a bright green circular background—ideal for highlighting commercial car park surfacing alerts. | Highways Plus

The Challenge:

Icon of a person wearing a hard hat and suit next to a cog, symbolising engineering, technical work, or commercial car park surfacing project management, on a bright green circular background. | Highways Plus

Our Solution:

A dark green bullseye target with an arrow in the centre, set against a bright lime green circular background—ideal for highlighting precision in commercial car park surfacing. | Highways Plus

The Outcome:

Proven delivery of road marking and signage across diverse sectors

Whether you’re managing public highways, private developments, or commercial estates, you need markings and signs that stay visible and compliant throughout their design life.

Sectors that rely on us:

Planned maintenance programmes, emergency remarking, junction improvements. NHSS-accredited delivery meeting CS 125 inspection standards and budget constraints.

Section 38 adoption-compliant markings, access junction signage, estate road markings. Fixed-fee installations supporting adoption sign-off.

Car park line marking, loading bay definition, directional signage. Durable systems handling heavy vehicle traffic without constant remarking.

 HGV route markings, yard line painting, loading bay signs. High-traffic specifications lasting under intensive use.

Customer car parks, pedestrian crossing markings, wayfinding signage. Aesthetic finishes meeting DDA requirements and maintaining brand presentation.

School zones, hospital campuses, council facilities. Traffic calming markings, accessible pedestrian routes, regulatory signage meeting public safety standards.

Your Road marking installation questions, answered...

Thermoplastic markings last 12-20 years on high-traffic roads versus 2-5 years for paint systems. Even under heavy use, thermoplastic maintains retroreflection above minimum standards for 10+ years, eliminating frequent remarking cycles.

Material costs £3.50-£5.50 per metre versus £1.00-£2.50 for paint. But lifecycle costs are lower—one thermoplastic application lasts as long as 4-8 paint applications. You save 40-60% over the marking’s lifespan when factoring in traffic management and permit costs for each remarking cycle.

BS EN 1436 retroreflection classes measuring how much light reflects back to drivers. RL3 requires 100 mcd minimum, RL4 requires 200 mcd. Higher performance means better visibility in poor conditions. We specify based on traffic volumes and safety requirements.

Chapter 8-compliant systems with advance warning zones (60-75m depending on road speed), lead-in tapers (13-175m), safety buffers, working space protection. NRSWA permits obtained via Street Manager, utility diversions coordinated, emergency access maintained throughout.

Yes. Most major route remarking happens overnight (10pm-6am) to avoid peak traffic. Thermoplastic application works well in night conditions, though we monitor temperature and moisture. Some councils prefer night works to reduce daytime congestion.

Our thermoplastic installations include performance guarantees based on traffic volumes and maintenance. Performance testing at 12, 24, 36 months verifies retroreflection standards. Premature failure from installation defects is remedied at our cost.

Yes, where required. Surface preparation includes removing legacy markings via grinding or burning-off, pressure washing, checking moisture content. Proper prep is critical—thermoplastic won’t bond properly to contaminated or wet surfaces.

Emergency safety-critical remarking: 24-48 hours. Planned programmes: typically 7-14 days after permit approval. We maintain equipment and materials ready for rapid deployment when junctions or crossings become dangerous.

As-built drawings in CAD/GIS showing all marking locations, retroreflectometry test results, material batch records, NRSWA closure documentation, performance testing schedule (12/24/36 months), photographic records. Everything for asset management systems and CS 125 inspections.

Book a Free, No-Obligation Road Marking Assessment
Book a Free, No-Obligation Road Marking Assessment

Need to understand what specification your markings require?

Book a Free, No-Obligation Road marking installation Assessment

We’ll assess your site, review current marking condition, recommend materials based on traffic volumes and safety requirements, provide fixed-fee quotation covering surveys through to documentation.

No obligation, no sales pressure—just expert advice from NHSS-accredited specialists who’ve installed thousands of metres of safety-critical road markings across council networks and private developments.

Call or fill out our form and we'll be in touch within 24 hours.

Highway maintenance and facitilies

Latest surfacing and civil's advice and news

Ready to discuss your project?

Complete the form below to speak to a specialist about your requirements or call us on 01761 202 012

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.