Chapter 8 Traffic Management Services

Professional traffic management that prevents programme shutdowns, safety incidents, and £2,500 regulatory fines. NHSS-accredited, rapid deployment, full compliance documentation.

Expert traffic management for contractors, developers, and authorities requiring complete regulatory compliance

Every roadwork that affects traffic flow on public highways must comply with Chapter 8 standards. No exceptions.

Hit a road without proper traffic control and you’re looking at Fixed Penalty Notices starting at £500, escalating to £2,500+ for serious breaches. Worse still, you’re risking site shutdowns, contract disputes, and genuine safety incidents that destroy reputations and programmes.

Get your traffic management right from day one

You need systems designed to Traffic Signs Manual Chapter 8 standards, installed by SWQR-qualified operatives, monitored throughout, and documented for authority sign-off.

We deliver this across the South West, South Wales, and the Thames Valley. From initial Traffic Management Plan design through to removal and close-out documentation, with NHSS 12A/B/C/D accreditation proving our competence.

What we can deliver for your site...

Why traffic management schemes fail, and how it wrecks your programme

The real-world impact...

There's a safer, more professional approach...

Sites running safely, traffic flowing, authorities satisfied. One partner handling everything from design to removal

NHSS-accredited expertise you can verify:

We hold NHSS 12A/B/C/D certification for motorway contraflow, standard schemes, mobile lane closures, and stop-and-go operations. Plus SWQR for all operatives.

Design approved first time:

Traffic Management Plans meeting Chapter 8 Part 1 standards, complete permit packs, stakeholder coordination sorted. NRSWA permits approved on first submission typically.

Deployed when you need it:

Standard mobilisation within 48 hours. Emergency response achieving 4-hour deployment for urgent incidents or service strikes.

Monitored throughout, adjusted as needed:

On-site supervision maintaining compliance, responding to incidents, adjusting for conditions. Not just installed and forgotten.

Documentation ready for sign-off:

As-built drawings, inspection records, permit close-outs, photographic evidence. Everything required for Section 278/38 adoption or contract completion.

One invoice, transparent pricing:

Fixed fees for defined scope. Clear variation processes for genuine scope changes, not gaps in what we quoted.

The Google logo is displayed above five gold stars in a row, representing a five-star rating for commercial car park surfacing or a high review score. | Highways Plus

Why main contractors and developers choose Highways Plus

You’re managing programmes where delays cost thousands per day and safety incidents destroy reputations. You need traffic management that works first time, every time – not suppliers learning on your project.

What sets us apart

NHSS 12A/B/C/D for every traffic management category. SWQR-qualified operatives and supervisors. ISO 45001 health and safety management. Inspectors check our credentials and move on.

Twenty-five years delivering motorway contraflows, major junction works, utility coordination, emergency responses. The difficult stuff that needs experience, not guesswork.

Emergency deployment within four hours, 24/7 availability. Equipment pre-positioned across the South West, South Wales, and Thames Valley. We’ve saved programmes others would’ve abandoned.

Our Traffic Management Plans achieve first-time NRSWA approval in 95%+ of submissions. We know what councils need because we work with them daily.

Traffic management coordinating with surfacing, drainage, utilities, adoption requirements. Not a separate silo creating interface problems.

Complete TM records, compliant installation evidence, permit close-outs. Section 278 and Section 38 authorities get everything they need without chasing.

A clear, structured process that keeps your site compliant

Good traffic management needs proper design, qualified installation, active monitoring. Full documentation proving compliance at every stage.

What you get...

Most schemes run through phased delivery – design and approvals first, installation coordinated with your programme, ongoing monitoring throughout works, systematic removal once complete.

Typical timelines: NRSWA permit approval 7-15 working days depending on work classification, TMP design 3-7 days for standard schemes, installation 4-8 hours for typical setups, removal 2-4 hours with final sign-off documentation within 48 hours.

1.

Site assessment and TMP design:

Desktop review of site conditions, traffic volumes, speed limits, vulnerable user routes. You get CAD-based Traffic Management Plan meeting Chapter 8 standards, risk assessment documentation, method statements.

2.

Permit applications and approvals:

NRSWA permit packs compiled and submitted via Street Manager, stakeholder coordination with councils and emergency services, TTRO preparation where required. Approvals tracked, you're updated on progress.

3.

Installation and commissioning:

SWQR-qualified operatives installing to approved TMP design, advance warning sections placed first working outwards, final safety checks before handover. Site ready for your works to start safely.

4.

Ongoing monitoring and maintenance:

Daily inspections maintaining compliance, sign and barrier condition checks, Traffic Safety Control Officer supervision where required, real-time adjustments for incidents or condition changes. Active management throughout, not install-and-forget.

5.

Removal and close-out:

Systematic removal sequenced to maintain safety, permit scheme notifications closed out via Street Manager, as-built documentation compiled, photographic evidence provided. Complete compliance records for your files or adoption authorities.

Chapter 8 traffic management services CASE STUDY

Major junction improvement scheme, South Gloucestershire

A magnifying glass icon focuses on a warning triangle with an exclamation mark inside, set against a bright green circular background—ideal for highlighting commercial car park surfacing alerts. | Highways Plus

The Challenge:

Icon of a person wearing a hard hat and suit next to a cog, symbolising engineering, technical work, or commercial car park surfacing project management, on a bright green circular background. | Highways Plus

Our Solution:

A dark green bullseye target with an arrow in the centre, set against a bright lime green circular background—ideal for highlighting precision in commercial car park surfacing. | Highways Plus

The Outcome:

Proven delivery of traffic management across diverse sectors

Whether you’re maintaining highways, building developments, installing utilities, or managing emergency repairs, you need traffic control that keeps workers safe and inspectors satisfied.

Sectors that rely on us:

Surfacing projects, junction improvements, highway maintenance requiring compliant traffic management integrated with construction programmes. Single partner coordinating TM with enabling works and adoption requirements.

Site access construction, Section 278 works, estate road building needing traffic control on public highways. TM designed to accelerate adoption sign-off with complete documentation.

Gas, water, electricity, telecoms installations requiring emergency response capability and permit coordination. 4-hour deployment minimising service outage duration.

Planned maintenance programmes, reactive repairs, winter operations needing NHSS-accredited contractors. Proven track record with regional councils across our service area.

Car park resurfacing, access road maintenance, delivery route upgrades requiring operational continuity. Off-peak installation minimising business disruption.

Temporary road closures, diversions, access control for public events and private functions. Professional traffic management maintaining safety and community relations.

Your Chapter 8 traffic management services questions, answered...

Any work disrupting traffic on public highways requires Chapter 8 compliance. Motorways and high-speed roads (50+ mph) need formal NHSS-accredited systems. Urban roads require Chapter 8 principles scaled to risk. Even minor works need basic traffic control meeting safety standards. We’ll assess your specific requirements during consultation.

NHSS 12A/B/C/D certification for different scheme types (motorway contraflow, standard schemes, mobile closures, stop-and-go). SWQR qualification for all operatives and supervisors – this is mandatory. ISO 45001 for health and safety management. Highways Plus holds all these accreditations and can provide evidence on request.

Major works (11+ days duration) need 10-15 working days notice. Standard works (4-10 days) need seven working days. Minor works (up to three days) need five working days. Immediate works (emergencies) are retrospective within two hours. Well-prepared applications typically get approved first time without delays.

Yes. Many schemes require off-peak or weekend installation to minimise disruption. We coordinate multi-shift operations, night-time mobilisation, weekend deployment as needed. Emergency response achieves 4-hour deployment 24/7, 365 days per year.

TMP design and CAD drawings, NRSWA permit applications, all signs/barriers/cones/equipment, qualified operatives and supervision, daily inspections and maintenance, removal and close-out documentation. Excludes only TTRO advertising costs (if required) and authority permit fees which we itemise separately.

Phased installation sequenced to maintain traffic flow, off-peak deployment where feasible, advance warning sections placed early, real-time monitoring with flow adjustments. Most standard schemes install in 4-8 hours with minimal delay impact. Emergency deployments prioritise safety over convenience but still maintain one-lane operation typically.

We maintain flexibility for scope changes, weather adjustments, discovered utilities. Our on-site supervision can modify schemes within approved permit parameters. Significant changes requiring new permits are assessed immediately with cost and programme impacts provided within 24 hours. Safety maintained throughout transitions.

Professional TM documentation accelerates adoption by providing complete compliance records, approved TMP design evidence, installation photographs, inspection logs, permit close-out confirmations. Authorities need this for sign-off. Missing or inadequate TM records delay adoption 6-12 weeks typically. We compile everything required from day one.

Yes. We manage traffic control around utility diversions, apparatus installations, emergency service works. Direct liaison with utility operators ensuring safe working zones, maintaining access for their crews, coordinating phased operations. Single traffic management envelope covering multiple trades where possible.

Book a Free, No-Obligation Traffic Management Assessment
Book a Free, No-Obligation Traffic Management Assessment

Need to understand what's required to keep your project compliant?

Book a Free, No-Obligation Chapter 8 traffic management services Assessment

We’ll review your site conditions, assess traffic management requirements, identify permit and approval timescales, provide a written quotation with clear scope and pricing.

No obligation, no sales pressure – just expert advice from NHSS-accredited specialists who’ve managed traffic control across hundreds of highway and construction projects.

Call or fill out our form and we'll be in touch within 24 hours.

Highway maintenance and facitilies

Latest surfacing and civil's advice and news

Ready to discuss your project?

Complete the form below to speak to a specialist about your requirements or call us on 01761 202 012

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.