...

Project Enabling Works & Site Preparation

We handle everything before your main works begin – utilities, contamination, archaeology, drainage, ground prep. One partner, fixed fees, construction-ready handover.

Specialist enabling works for developers, main contractors, and construction projects requiring certainty

Every construction project depends on what happens before the first brick gets laid.

Unknown utility locations, suspected contamination, archaeological potential, uncertain ground conditions – any one of these can add months to your programme and 30-50% to your budget when they surface mid-construction.

Get your site properly prepared before main works start

You need confidence that everything’s been found, mapped, and dealt with upfront. Every underground service located. Every environmental risk assessed. Every regulatory approval secured.

We deliver this across the South West, South Wales, and the Thames Valley. Initial surveys through to construction-ready handover with full documentation.

What we can deliver for your site...

Why enabling works projects fail, and why it destroys programmes

The hidden risks that emerge during site prep

There's a smarter approach...

Sites prepared right, every risk managed upfront. One partner handling everything

One partner for everything:

We manage utilities, contamination, archaeology, ecology, drainage, groundworks. You're not coordinating five specialists or managing interface risks.

Fixed fees, no surprises:

Transparent pricing. Clear change control for genuine discoveries, not gaps in our scope.

Know what you're buying:

Site investigation finding utilities, contamination, archaeology, ground conditions before main contract pricing. You know the full picture upfront.

Fast delivery, lower holding costs:

Sites ready in 8-16 weeks depending on complexity, not six months of your capital sitting idle.

Compliance documentation sorted:

Archaeological sign-off, ecological approvals, utility certificates, contamination clearance. Everything for building control and adoption ready.

Main contractors start with certainty:

As-builts, utility diversions mapped, contamination cleared, geotech results provided. They know exactly what they're building on.

The Google logo is displayed above five gold stars in a row, representing a five-star rating for commercial car park surfacing or a high review score. | Highways Plus

Why developers and main contractors choose Highways Plus

You’re managing tight programmes and fixed budgets. You need a partner who gets that enabling works aren’t about what gets built – they’re about preventing the disasters that wreck construction programmes.

What sets us apart

Twenty-five years managing complex site prep. Unexpected asbestos? Been there. Uncharted utilities? Fixed it. Archaeological finds? Handled hundreds.

We coordinate all the specialists. You don’t juggle five different contractors and pray they talk to each other.

 Fixed-fee pricing. You can price your main contract accurately and give confident ROI projections, not vague estimates.

Mobilisation within two weeks. Most enabling works done in 8-16 weeks, with phased handovers so main works can start.

Managing Section 278 or Section 38? We handle that alongside enabling works – traffic management, utility coordination, adoption paperwork as one seamless job.

As-builts, utility certificates, contamination clearance, archaeological discharge, ecological approvals. Everything you need for adoption or building control.

A clear process that de-risks your site

Enabling works need thorough investigation, coordinated specialists, methodical preparation. Full documentation at every stage.

What you get...

Most projects run through phased delivery – surveys and investigations first, establishing the full scope before physical works begin.

Typical timelines: 8-12 weeks for straightforward commercial sites, 12-16 weeks for complex developments with contamination or archaeology, 4-6 weeks for smaller industrial projects.

1.

Site assessment and risk identification:

Desktop study of environmental records, utility maps, planning history, archaeological potential. You get a risk register flagging every enabling requirement before we dig.

2.

Surveys and investigations:

Topographical surveys, Ground Penetrating Radar for utilities, geotechnical testing, contamination assessment, ecological surveys if needed. Complete site knowledge, zero surprises.

3.

Scope and fixed pricing:

Works specification with clear pricing and programme. You approve everything before we start.

4.

Execution and monitoring:

Utility disconnections, contamination remediation, archaeological investigation, drainage installation, ground prep - coordinated phases with regular progress updates.

5.

Handover:

As-builts, utility certificates, contamination clearance, archaeological discharge, geotech results. Main contractors get a fully documented, construction-ready site.

Project enabling works CASE STUDY

Mixed-use development site, Bristol

A magnifying glass icon focuses on a warning triangle with an exclamation mark inside, set against a bright green circular background—ideal for highlighting commercial car park surfacing alerts. | Highways Plus

The Challenge:

Icon of a person wearing a hard hat and suit next to a cog, symbolising engineering, technical work, or commercial car park surfacing project management, on a bright green circular background. | Highways Plus

Our Solution:

A dark green bullseye target with an arrow in the centre, set against a bright lime green circular background—ideal for highlighting precision in commercial car park surfacing. | Highways Plus

The Outcome:

Proven delivery across diverse sectors

Whether you’re developing residential, commercial, industrial, or infrastructure projects, you need confidence your site’s fully prepared before main works begin.

Sectors that rely on us:

Housing developers managing contaminated brownfield sites, utility conflicts, archaeological conditions. Single accountability from acquisition through to construction-ready handover.

Office parks, retail, business estates requiring ground investigation, utility diversions, drainage infrastructure. Enabling works delivered on fixed programmes keeping fit-out schedules on track.

Warehouse and distribution sites needing heavy-duty ground prep, utility upgrades, access road construction. Sites ready for immediate mobilisation with full geotechnical validation.

Road schemes, junction improvements, public realm works requiring utility diversions, traffic management, Section 278 coordination. Enabling works integrated with adoption requirements.

School expansions, healthcare facilities, council developments with strict planning conditions and archaeology. Compliance-focused delivery meeting public procurement standards.

Shopping centres, leisure parks, hospitality developments where phased enabling maintains partial operation. Minimal disruption whilst preparing expansion areas.

Your Project enabling works questions, answered...

Straightforward commercial sites: 8-12 weeks. Complex developments with contamination or archaeology: 12-16 weeks. Smaller infrastructure: 4-6 weeks. We provide detailed timelines at quotation based on your specific site.

Site investigation, utility mapping and disconnection, contamination assessment, archaeological investigation where required, drainage installation, ground prep, access route construction. Traffic management, waste disposal, specialist subcontractors included. Excludes only genuine unforeseen ground conditions not identifiable through reasonable investigation.

Yes. We coordinate licensed asbestos contractors, contaminated land specialists, archaeological consultants as part of our integrated service. Planning conditions requiring Written Schemes of Investigation, ecological surveys, Heritage Impact Assessments – all managed through our established specialist network.

We manage all disconnection applications, obtain C3 and C4 permits where required, coordinate site access for utility operators, arrange diversions through direct frameworks or approved contractors. As-builts capture all service locations for main contractor handover.

Our investigation minimises surprises. If genuine unforeseen conditions emerge, we stop immediately, assess implications with you, provide options with clear cost and programme impacts. No additional work proceeds without your explicit approval.

Properly executed enabling accelerates overall programmes by eliminating discovery-phase disasters during main construction. Sites with inadequate prep typically experience 8-16 week delays when utilities, contamination, or archaeology emerge unexpectedly. Our approach front-loads investigation, keeping main works on schedule.

Yes. We manage highway adoption simultaneously with enabling works – traffic management, utility diversions affecting adopted highways, adoption documentation. Sites requiring Section 278 for access or Section 38 for new roads get integrated enabling and adoption management.

As-builts showing all utility diversions in CAD and GIS, disconnection certificates, contamination clearance validation, archaeological discharge, geotech results, traffic management records, waste transfers. Everything needed for building control, adoption authorities, warranty providers.

Desktop assessment and survey scoping: 48 hours. Site investigation mobilisation: typically 7-10 working days. Physical enabling works start: within two weeks of scope approval. Emergency mobilisation available for accelerated programmes.

Book a Free, No-Obligation project enabling works Assessment
Book a Free, No-Obligation project enabling works Assessment

Need to understand what's required to prepare your site?

Book a Free, No-Obligation Project enabling works Assessment

We’ll review your site, assess enabling requirements, identify risks affecting programme and budget, provide a written report with fixed-fee quotation.

No obligation, no sales pressure – just expert advice from specialists who’ve managed complex site prep across hundreds of development and infrastructure projects.

Call or fill out our form and we'll be in touch within 24 hours.

Civil engineering and infrastruction

Latest surfacing and civil's advice and news

Ready to discuss your project?

Complete the form below to speak to a specialist about your requirements or call us on 01761 202 012

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.