Ducting and Cabling Installation

We install ducting for electricity, telecoms, water, and gas networks that meets ENA standards, passes first-time adoption, and keeps your programme moving. Fixed fees, expert coordination, full compliance.

Specialist ducting and cabling installation for developers, utility companies, and commercial operators who can't afford adoption delays

Every development, infrastructure upgrade, or site expansion needs utilities. But getting electricity, fibre, water, and gas to your site isn’t just about digging trenches and laying pipes.

It’s about navigating Section 278 traffic management approvals, coordinating with four different utility operators who all want access at different times, ensuring your installation meets ENA TS 12-24 standards so the DNO actually adopts it, and managing ground conditions that weren’t on the survey.

Get your utilities installed once, properly, to adoption standards

You need ducting that passes inspection first time. Routes coordinated so electricity doesn’t clash with water. Documentation that speeds adoption, not delays it.

We deliver this across the South West, South Wales, and the Thames Valley. From initial utility coordination through to as-built surveys and adoption sign-off, with full NHSS accreditation and ISO compliance.

What we can deliver for your site...

Why ducting projects overrun, blow budgets, and delay adoption

The real-world impact...

There's a better way to deliver utilities infrastructure...

Ducting installed to adoption standards, coordinated properly, delivered on time. One partner managing every utility, every approval, every detail

All utilities coordinated through one partner:

We manage electricity, telecoms, water, gas. You're not juggling four utility operators and praying they talk to each other.

First-time adoption compliance:

ENA TS 12-24 standards, correct depths, proper materials, full documentation. DNOs and highway authorities sign off without rework.

Fixed fees with no scope creep:

Transparent pricing covering design, installation, traffic management, testing, adoption documentation. Clear change control for genuine ground condition surprises, not gaps in our scope.

Utility coordination sorted before we dig:

We liaise with Western Power, Openreach, Thames Water, Wales & West Utilities upfront. Access scheduled, clashes resolved, approvals secured before mobilisation.

Traffic management expertise:

Section 278 approvals, NRSWA street works permits, Chapter 8-compliant setup. We know what highway authorities need and how long approvals actually take.

Programme certainty you can bank on:

Realistic timelines accounting for utility coordination, traffic management approvals, testing schedules. No over-promising. Just honest assessments and reliable delivery.

The Google logo is displayed above five gold stars in a row, representing a five-star rating for commercial car park surfacing or a high review score. | Highways Plus

Why developers and commercial operators choose Highways Plus

You’re managing capital that’s tied up until adoption happens. Every week of delay is another week of holding costs, another week before you can release funds, another week your ROI timeline slips. 

What sets us apart

Twenty-five years coordinating complex multi-utility installations. Utility clashes? Resolved hundreds. DNO rejections? Know exactly how to prevent them. Traffic management delays? We build them into realistic programmes.

Managing Section 278 or Section 38 adoption? We handle utilities installation alongside highway adoption – one team, one programme, one set of documentation for final sign-off.

We won’t promise four-week delivery when traffic management approvals alone take eight. You get realistic programmes accounting for utility coordination, testing, approvals.

 Directional drilling for road crossings and congested areas. Yes, it costs more per metre – but saves thousands on traffic management, surface reinstatement, programme acceleration.

Backlog defects delaying scheme sign-off? We offer fixed-fee packages covering defect resolution, documentation, liaison with highway authorities. Accelerate your adoption by months.

As-builts, testing certificates, utility adoption paperwork, Section 278 records. Everything needed for highway adoption, warranty providers, building control.

A clear, structured process that keeps your site running

Utility installation needs thorough planning, proactive coordination with multiple operators, methodical testing and documentation at every stage.

What you get...

Most projects follow phased delivery – utility coordination and design approvals secured before any excavation begins. Traffic management mobilised only when all utility access is confirmed.

Typical timelines: 6-10 weeks for straightforward commercial sites with single utility installation, 10-16 weeks for multi-utility developments requiring Section 278 coordination, 4-6 weeks for industrial projects with minimal traffic management.

1.

Utility coordination and design approval:

Desktop searches, liaison with DNOs and utility operators, route survey, design to ENA TS 12-24 standards. You get confirmed utility access dates and approved designs before we mobilise.

2.

Permits and traffic management setup:

NRSWA street works permits, Section 278 approvals if needed, Chapter 8-compliant traffic management. Site ready for safe, compliant installation.

3.

Installation to adoption standards:

Excavation to correct depths (450-1200mm for carriageways, 250-450mm for footpaths), duct laying with proper bedding and backfill, warning tape installation, surface reinstatement. DNO inspections at key stages.

4.

Testing, commissioning, and handover documentation:

CCTV surveys, cable pulling if required, as-built drawings, testing certificates. Everything needed for utility adoption and highway authority sign-off.

Ducting and cabling installation CASE STUDY

Mixed-use development scheme, Thames Valley

A magnifying glass icon focuses on a warning triangle with an exclamation mark inside, set against a bright green circular background—ideal for highlighting commercial car park surfacing alerts. | Highways Plus

The Challenge:

Icon of a person wearing a hard hat and suit next to a cog, symbolising engineering, technical work, or commercial car park surfacing project management, on a bright green circular background. | Highways Plus

Our Solution:

A dark green bullseye target with an arrow in the centre, set against a bright lime green circular background—ideal for highlighting precision in commercial car park surfacing. | Highways Plus

The Outcome:

Proven delivery of ducting and cabling installation across diverse sectors

Whether you’re developing housing, expanding commercial operations, or upgrading infrastructure networks, you need utilities that meet adoption standards and support future growth.

Sectors that rely on us:

Developers managing Section 38 adoption requiring ENA-compliant electrical ducting, FTTP telecommunications infrastructure, water service connections. Single partner from utility coordination through adoption sign-off.

Office developments, retail parks, business estates needing multi-utility infrastructure with minimal operational disruption. Fixed programmes keeping fit-out schedules on track.

 Warehouse and distribution centres requiring heavy-duty electrical supplies, data connectivity, water services. Future-proofed infrastructure supporting operational expansion.

DNO frameworks, water company mains reinforcement, telecoms fibre rollout programmes. Compliant installation meeting network operator standards and adoption requirements.

Road schemes, junction improvements requiring utility diversions, Section 278 coordination, traffic management. Utilities installation integrated with highway adoption requirements.

Council developments, school expansions, healthcare facilities with strict compliance requirements and public procurement standards. Professional delivery meeting authority specifications.

Your Ducting and cabling installation questions, answered...

Straightforward single-utility installations: 6-10 weeks. Multi-utility developments with Section 278 coordination: 10-16 weeks. Smaller commercial projects: 4-6 weeks. Timelines depend on traffic management approvals, utility operator coordination, and ground conditions. We provide detailed programmes at quotation.

All electrical ducting meets ENA TS 12-24 standards for DNO adoption. Telecommunications infrastructure complies with Openreach and network operator specifications. Water installations meet Section 104 requirements where applicable. We hold NHSS accreditation and ISO 9001, 14001, 45001 certifications.

Yes. We offer directional drilling for road crossings, congested areas, sites where surface disruption must be minimised. Costs 20-30% more per metre than traditional trenching but typically saves thousands on traffic management, surface reinstatement, and programme acceleration.

We manage all liaison with DNOs (Western Power, SSE, National Grid), telecoms operators (Openreach, Virgin Media), water companies (Thames Water, Wessex Water, Welsh Water), and gas networks (Wales & West Utilities, Cadent). Access scheduled, approvals secured, clashes resolved before mobilisation.

Our utility searches and Ground Penetrating Radar surveys minimise surprises. If genuine unforeseen conditions emerge, we stop immediately, assess implications with you, provide options with clear cost and programme impacts. No additional work proceeds without your explicit approval.

Yes. We manage NRSWA street works permits, Section 278 approvals, Chapter 8-compliant traffic management setup. Our experience with highway authorities means we know approval timelines, design requirements, and how to prevent rejection.

Yes. We offer fixed-fee backlog defect resolution covering survey, rectification, missing installations, utility coordination, documentation. Specialist service accelerating Section 38 or Section 104 adoption that’s been delayed by defects.

As-built drawings in CAD and GIS showing exact utility locations, depths, materials. Testing certificates, CCTV surveys, utility adoption paperwork, Section 278 compliance records. Everything needed for highway adoption, warranty providers, building control, future maintenance.

Utility coordination and design: 7-10 working days. Traffic management and permit applications: 2-4 weeks depending on highway authority. Physical works start: within four weeks of scope approval for projects with straightforward approvals. Emergency mobilisation available for critical programmes.

Book a Free, No-Obligation Ducting Installation Assessment
Book a Free, No-Obligation Ducting Installation Assessment

Need utilities infrastructure that passes adoption first time?

Book a Free, No-Obligation Ducting and cabling installation Assessment

We’ll review your site, assess utility coordination requirements, identify risks affecting programme and adoption, provide a written report with fixed-fee quotation.

No obligation, no sales pressure – just expert advice from specialists who’ve delivered compliant utility installations across hundreds of development and infrastructure projects.

Call or fill out our form and we'll be in touch within 24 hours.

Civil engineering and infrastruction

Latest surfacing and civil's advice and news

Ready to discuss your project?

Complete the form below to speak to a specialist about your requirements or call us on 01761 202 012

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.