...

Highway Drainage Solutions & SuDS Installation

We design and install highway drainage systems that prevent flooding, protect road surfaces, and meet planning requirements. Traditional systems or SuDS – one partner handling everything from design through adoption.

Highway drainage for councils, developers, and infrastructure projects requiring compliance

Every highway depends on effective drainage you never see. Until it fails.

When surface water isn’t managed right, you get flooded carriageways, water ingress accelerating pothole formation, planning refusals, and adoption nightmares dragging on for months whilst your capital sits locked up.

Get drainage designed and installed to adoptable standards

You need systems that handle 1-in-100-year rainfall events, meet environmental regulations, and get signed off by highway authorities or water companies without endless remediation rounds.

We deliver this across the South West, South Wales, and Thames Valley. Highway drainage expertise backed by NHSS accreditation, with full understanding of both English planning requirements and Welsh SAB approval processes.

What we can deliver for your site...

Why highway drainage fails - and why it destroys programmes and budgets

The design and installation failures causing problems

There's a better way...

Drainage designed right, installed to adoptable standards. One partner managing the full lifecycle

Proper investigation before design:

Infiltration testing, groundwater assessment, soil analysis, outfall surveys. We design systems based on what's actually underground, not guesses or desktop assumptions.

Compliant design meeting adoption standards:

Section 104 specifications, highway authority requirements, SuDS standards. Systems designed for approval first time, not endless revision rounds.

Environmental compliance built in:

Water quality treatment, pollution prevention, biodiversity enhancement where SuDS are used. Planning conditions satisfied, environmental consents secured.

Installation by NHSS-accredited teams:

Highway works delivered to National Highway Sector Schemes standards. Quality assured, properly supervised, inspected at every stage.

Traffic management included:

Chapter 8-compliant controls, safe working zones, minimal disruption. Highways kept operational, public safety maintained throughout.

Full adoption documentation provided:

As-builts, infiltration test results, maintenance schedules, consent certificates. Everything needed for Section 38, Section 104, or SAB approval. Ready at handover.

The Google logo is displayed above five gold stars in a row, representing a five-star rating for commercial car park surfacing or a high review score. | Highways Plus

Why councils and developers choose Highways Plus

You’re managing infrastructure that must work for decades. And it must satisfy regulators who’ll reject systems that don’t meet standards.

What sets us apart

English planning and Lead Local Flood Authority consultation processes, Welsh SAB approval requirements. Whether you’re in Somerset, South Wales, or Thames Valley, we know what’s needed for approval.

Section 38 highway schemes with drainage designed as part of the adoptable infrastructure. Section 278 junction improvements with upgraded drainage. One contractor, one adoption process.

Not all sites suit infiltration. We design whichever approach works – permeable paving and swales where ground conditions allow, piped systems where they don’t.

Infiltration testing, percolation tests, groundwater monitoring during winter. We design based on actual site conditions, not desktop assumptions.

Design, approvals, installation, testing, documentation, handover. You’re not coordinating drainage designers, contractors, adoption consultants separately.

Backlog defect resolution for existing non-compliant drainage. Lump-sum pricing bringing systems up to adoptable standards, clearing the path to sign-off.

A clear, structured process that delivers adoptable systems

Highway drainage needs thorough investigation, compliant design, quality installation, comprehensive testing. Full documentation at every stage.

What you get...

Projects typically run through design, approval, and installation phases with testing and handover documentation provided throughout.

Typical timelines: 6-10 weeks for standalone drainage installations, 12-16 weeks where approvals from water companies or Lead Local Flood Authorities are needed, integrated with highway construction programmes for Section 38 schemes.

1.

Site investigation and feasibility:

Desktop studies, infiltration testing, groundwater monitoring, outfall surveys. You get a drainage strategy showing what's viable before detailed design starts.

2.

Design and regulatory approval:

Hydraulic calculations, SuDS component sizing, Section 104 or SAB submissions. Designs approved by water companies, highway authorities, or SABs before installation.

3.

Installation with quality assurance:

NHSS-accredited teams, traffic management, material testing, compaction checks. Drainage installed to specification with independent inspection throughout.

4.

Testing and commissioning:

Half-drain time testing for infiltration systems, CCTV surveys of pipes, flow testing of gullies. Systems proven to perform before handover.

5.

Adoption documentation and handover:

As-built drawings, test certificates, maintenance schedules, consent documentation. Everything required for Section 38, Section 104, or SAB adoption provided in approved formats.

Highway drainage solutions CASE STUDY

Residential development, North Somerset

A magnifying glass icon focuses on a warning triangle with an exclamation mark inside, set against a bright green circular background—ideal for highlighting commercial car park surfacing alerts. | Highways Plus

The Challenge:

Icon of a person wearing a hard hat and suit next to a cog, symbolising engineering, technical work, or commercial car park surfacing project management, on a bright green circular background. | Highways Plus

Our Solution:

A dark green bullseye target with an arrow in the centre, set against a bright lime green circular background—ideal for highlighting precision in commercial car park surfacing. | Highways Plus

The Outcome:

Proven delivery of highway drainage solutions across diverse sectors

Whether you’re maintaining public highways, developing residential estates, or delivering commercial infrastructure, you need drainage systems that work reliably and get adopted without problems.

Sectors that rely on us:

Planned drainage upgrades, emergency repairs, flooding hotspot remediation. Systems maintaining highway networks safely whilst satisfying environmental requirements.

Section 104 sewer adoption systems, SuDS meeting planning conditions, Section 38 estate road drainage. Developments signed off without backlog defects delaying sales.

Car park drainage, logistics yard surface water management, attenuation systems for large roof areas. Cost-effective solutions meeting water company requirements.

Drainage subcontract packages for highway schemes, Section 278 junction drainage, infrastructure projects. Reliable delivery keeping main programmes on track.

Road widening schemes, junction improvements, new highway construction. Drainage designed and installed to adoptable standards as part of Section 38 or Section 278 agreements.

Car park drainage, access road surface water management, landscaping drainage. Attractive SuDS features combining functionality with aesthetics.

Your Highway drainage solutions questions, answered...

Traditional systems collect surface water through gullies and pipes, discharging to sewers or watercourses. SuDS manage water where it falls using infiltration, storage, and controlled release. Mimics natural drainage whilst providing environmental benefits like water quality treatment and biodiversity. We design whichever approach suits your site conditions and regulatory requirements.

Standalone installations: 6-10 weeks depending on complexity. Projects requiring water company or Lead Local Flood Authority approval: 12-16 weeks including design and consent periods. Emergency repairs or upgrades: mobilisation within 48 hours, completion typically within one week.

In England: Lead Local Flood Authority consultation through planning system, Environment Agency consent for discharges to main rivers, water company approval for Section 104 adoptable sewers. In Wales: SAB (SuDS Approving Body) approval mandatory for developments over 100m2. We manage all approval processes as part of our service.

Yes. We investigate failure causes through CCTV surveys, flow testing, infiltration assessment. Solutions range from gully cleaning and pipe repairs through to complete system redesign and installation. Emergency response available for flooding incidents affecting highway safety.

Depends on design. Permeable paving needs regular sweeping and occasional pressure washing. Swales need seasonal vegetation cutting. Underground attenuation crates? Minimal maintenance if designed with access chambers. We provide maintenance schedules with every installation showing exactly what’s required and how often. No surprises.

We design attenuation systems storing water temporarily and releasing gradually to approved outfalls. Permeable paving can be Type C (attenuation, no infiltration). Underground crates with controlled discharge. Traditional piped systems where environmental benefits aren’t achievable. Proper investigation before design prevents expensive retrofits.

Drainage is designed as part of the adoptable highway infrastructure. Highway authority reviews drainage alongside road construction. Single adoption agreement covering roads, footways, drainage. As-built drawings capture both surface and drainage infrastructure. One contractor managing both elements eliminates interface risks.

As-built drawings in CAD and GIS formats, infiltration test certificates, CCTV surveys of pipework, maintenance schedules, water company consent certificates, Environment Agency discharge consents, material test certificates, compaction records. Everything required for Section 38, Section 104, or SAB adoption provided in approved formats.

Yes. Mobilisation within 48 hours for flooding incidents or drainage failures affecting highway safety. Chapter 8 traffic management, emergency excavation permits, out-of-hours working available. Temporary repairs for immediate safety, permanent solutions programmed to suit your budget cycles.

Book a Free, No-Obligation Highway Drainage
Book a Free, No-Obligation Highway Drainage

Need drainage designed to meet adoption standards?

Book a Free, No-Obligation Highway drainage solutions Assessment

We’ll assess your site, test ground conditions if needed, identify the drainage approach that satisfies regulatory requirements whilst controlling costs, provide a written report with fixed-fee quotation.

No obligation, no sales pressure – just expert advice from NHSS-accredited specialists who’ve delivered highway drainage across hundreds of projects in the South West, South Wales, and Thames Valley.

Call or fill out our form and we'll be in touch within 24 hours.

Civil engineering and infrastruction

Latest surfacing and civil's advice and news

Ready to discuss your project?

Complete the form below to speak to a specialist about your requirements or call us on 01761 202 012

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.