Highways Plus has invested in advanced paving capability that solves three critical client challenges: compressed timelines, comprehensive quality documentation for adoption, and complex site geometry. The VÖGELE SUPER 1803-3(i) delivers measurable benefits – GPS-tagged temperature monitoring, and 3.5-metre turning circles for constrained sites, contributing to a 25% faster project completions and quicker Section 278 handovers.


40% growth demands capability investment

When your project pipeline grows 40% in 18 months, you can’t simply work harder. You need to work smarter with equipment that transforms what’s possible.

Highways Plus recently acquired the VÖGELE SUPER 1803-3(i) wheeled paver – but this isn’t a story about buying impressive machinery. It’s about responding to specific problems that commercial clients, developers, and main contractors tell us they’re facing on every project.

The outcome? Projects that previously took days now complete in shifts. Quality documentation that used to require weeks of compilation generates automatically. Complex geometry that created timeline delays becomes routine work.

Tony Flook, Highways Plus stands next to the recently acquired VÖGELE SUPER 1803-3(i) wheeled paver
Tony Flook, Highways Plus stands next to the recently acquired VÖGELE SUPER 1803-3(i) wheeled paver

“We’re not investing in equipment because it looks good,” says Tony Flook, Managing Director. “We’re investing because clients need faster timelines, documented quality, and certainty on complex projects. This gives us the technical capability to deliver exactly that.”

Three client problems solved


1. Complex geometry no longer extends timelines

Estate roads with 14 tight corners. Car parks with constrained access. Urban sites where every metre matters.

Pivot Steer technology reduces the outside turning circle to 3.5 metres, which means complex geometry becomes straightforward work rather than a programme-extending challenge.

Real-world result: A recent Salisbury estate road project budgeted for three days based on previous contractor timelines. Highways Plus completed the entire paving programme in one eight-hour shift.

For developers facing show home deadlines, that timeline compression has direct ROI impact. For main contractors managing multiple sites, it reduces programme conflicts and weather exposure.


2. Quality documentation proves specification compliance

Highway adoption authorities don’t want promises. They want proof.

The integrated RoadScan temperature monitoring system provides exactly that:

FeatureBenefitHigh-precision infrared scanningMeasures entire pave width in 25cm × 25cm grid squares±2°C accuracyAcross complete 0-250°C temperature rangeGPS positioning dataEvery reading includes location coordinatesAutomated reportingGenerates adoption-ready documentation automatically

No assumptions. No extrapolation from sample points. Complete coverage of every square metre.

“We recently completed Section 278 works where the highways authority required comprehensive temperature documentation,” explains Mike Clancy, Non-Executive Director. “With RoadScan, we provided GPS-tagged data for every square metre. The adoption process that typically takes months completed in six weeks.”


3. Productivity without quality compromise

A wide, empty street lined with modern, two-storey houses on both sides features well-kept lawns and streetlights—an example of a development where what is a section 38 agreement might apply to ensure proper road adoption. | Highways Plus
A wide, empty street lined with modern, two-storey houses on both sides features well-kept lawns and streetlights—an example of a development where what is a section 38 agreement might apply to ensure proper road adoption. | Highways Plus

Let’s translate technical specifications into project benefits:

700 tonnes/hour laydown rate means:

  • Car parks that required two weeks now finish in four days
  • Warehouse yards that tied up resources for a month complete in a fortnight
  • Section 278 works deliver 25% faster than previous benchmarks

13-tonne material hopper capacity means:

  • Minimal interruptions during truck changes
  • Consistent material flow maintains quality
  • Fewer stop-start cycles that create potential defects

Automated grade control (Niveltronic Plus) means:

  • Specification-compliant levels first time, every time
  • Reduced rectification risk on Section 104/278/38 works
  • Plug-and-play sensor connectivity speeds setup

“The productivity advantage isn’t just machine output. It’s how faster completion reduces overall project risk – less weather exposure, fewer programme conflicts, earlier handover. Every day we compress your timeline has a multiplier effect on project value.”
– Mike Clancy, Non-Executive Director

How this advanced paving capability enhances our service portfolio


This capability investment directly strengthens every commercial service Highways Plus delivers:

✓ Section 278 Highway Works
Full specification compliance with documented quality accelerates adoption timelines by up to 40%.

✓ Commercial Car Park Surfacing
Complex geometry handling with 3.5m turning circles eliminates timeline delays on constrained sites.

✓ Road Construction & Resurfacing
Eight-metre paving width capability with automated quality systems ensures consistent specification compliance.

✓ Warehouse Yard Construction
High-output capability (700t/hour) delivers large-area surfacing in compressed timeframes.

A wet, empty lorry depot with parked lorries and vans near large warehouse buildings showcases advanced paving, as white directional arrows and parking markings stand out on the shiny, rain-soaked pavement under a cloudy sky. | Highways Plus
A wet, lorry depot with parked lorries and vans near large warehouse buildings showcases advanced paving, as white directional arrows and parking markings stand out on the shiny, rain-soaked pavement under a cloudy sky. | Highways Plus

✓ Project Enabling Works
Variable screed width (2.55m to 8m) means comprehensive capability across every project phase.

✓ Section 104 Adoption Management
GPS-tagged temperature monitoring provides the comprehensive documentation adoption authorities require.

The numbers behind strategic investment


Pipeline Growth: 40% increase over 18 months driven by demand for contractors who deliver certainty

Completion Speed: 25% faster on Section 278 works with full quality documentation

Adoption Timeline: 40% reduction in highways authority adoption processes due to comprehensive quality proof

Quality Consistency: Zero defect rectification on projects completed with automated quality systems

Programme Reliability: 30% reduction in weather-related delays through faster completion

“The business case wasn’t based on assumptions,” Clancy notes. “It was clear client demand and measurable benefits we could deliver. Three months in, the results validate that decision completely.”

Environmental and operational advantages


Construction workers in orange reflective gear operate machinery and lay fresh tarmac on a motorway at night, with steam rising from the hot surface—a testament to strategic investment and a focus on timely project completion under bright work lights. | Highways Plus
Construction workers in orange reflective gear operate machinery and lay fresh tarmac on a motorway at night, with steam rising from the hot surface—a testament to strategic investment and a focus on timely project completion under bright work lights. | Highways Plus

Strategic investment delivers benefits beyond project completion:

EcoPlus low-emissions package:

  • Significantly reduced fuel consumption
  • ≤85 dB(A) noise emissions at operator stations
  • EU Stage V / US EPA Tier 4f compliance
  • ECO mode maintains full output at reduced 1,700 rpm

Wheeled configuration advantages:

  • Self-transport at 20 km/h reduces mobilisation costs
  • Lower maintenance requirements vs tracked alternatives
  • Extended service intervals reduce downtime
  • Fewer moving parts improve reliability

These operational efficiencies directly impact project costs while supporting sustainability credentials increasingly required for public sector contracts.

Client-specific advantages


For Developers:

  • Complex geometry no longer extends timelines
  • Comprehensive documentation accelerates adoption
  • Faster completion reduces capital holding costs
  • Show home deadlines met with documented quality

For Main Contractors:

  • Reliable subcontractor partnership with proven capability
  • Automated quality systems reduce defect liability
  • Comprehensive documentation satisfies QA requirements
  • Faster completion minimises programme conflicts

For Local Authorities:

  • Verified specification compliance with complete documentation
  • Reduced rectification risk through automated quality control
  • Faster project completion minimises public disruption
  • Long-term value through consistent quality

What this means for your next project


A bright yellow road paver machine, ideal for motorways and faster project completion, is parked on a paved area outside a modern office building with large windows and a sign that reads "Wirtgen Group. | Highways Plus
A bright yellow road paver machine, ideal for motorways and faster project completion, is parked on a paved area outside a modern office building with large windows and a sign that reads “Wirtgen Group. | Highways Plus

If you’re planning commercial surfacing work in the South West, Wales, Thames Valley, or Home Counties, Highways Plus now delivers:

✓ Proven capability on complex projects
✓ Comprehensive quality documentation for adoption
✓ Timeline compression without quality compromise
✓ Specification compliance you can verify
✓ Equipment reliability backed by VÖGELE’s 180+ year heritage

Want the full story? Read our comprehensive article exploring how strategic equipment investment delivers project certainty: Building Plant News Latest Edition

Your project deserves more than promises


Strategic investment in capability means Highways Plus can now deliver what clients actually need: faster timelines, documented quality, and project certainty.

Not with promises, but with proven technology, documented results, and measurable benefits on completed projects.

Ready to discuss your specific project requirements?

Contact Tony Flook directly on 01761 202 012 or visit highwaysplus.co.uk to discuss how our enhanced capability solves your challenges.

Your project is our business.

Logo for "Highways Plus" featuring abstract green road design on the left. The text "Highways" is in white and "Plus" in green, with the slogan "Your project is our business" below in light grey. | Highways Plus

Your Commercial Surfacing & Civil Engineering Specialists

Your project is our business
Not just our tagline - it's how we operate on every project.