Expert Highways Solutions
Our core commercial surfacing services and highways solutions include road surfacing, pavement repairs, signage installation, traffic management, and infrastructure upgrades.
Highways Plus Commercial Surfacing Services
Backlog Defect Resolution
Get stalled developments moving again. Our fixed-fee service resolves adoption blockers and accelerates sign-off.
Section 38 Road Adoption (S38)
Take the complexity out of road adoption. We handle technical delivery and authority liaison throughout.
Section 104 Agreement (S104)
Drainage design, installation, and compliance to meet the technical and regulatory requirements for Section 104 sewer adoption.
Section 278 Highway Works (S278)
Highway works that satisfy planning conditions and keep your development programme moving forward on schedule.
Commercial Car Park Surfacing
Surfaces built for busy commercial environments that resist wear and maintain their appearance under pressure.
Commercial Driveways
Make the right impression with hardwearing entrances designed for commercial traffic and lasting kerb appeal.
Footpaths and paving
Pedestrian surfaces that prioritise safety and accessibility while giving your site a professional finish.
Heavy-Duty Industrial Surfacing
Surfaces that take the punishment of HGVs and heavy plant without breaking down under pressure.
Road construction and repair
New roads, renewals, and repairs delivered to the standards that local authorities and clients expect.
Road Resurfacing & Reconstruction
Renew and strengthen road surfaces to adoption-ready standards, extending infrastructure life and accelerating sign-off.
Sustainable Road Construction
Lower-carbon surfacing solutions that help you meet environmental commitments without sacrificing durability or quality.
Civil Engineering Services
Full civil engineering capability from an ISO-accredited team, supporting your project from design to handover.
SuDS Drainage Systems
Manage surface water properly with drainage systems that protect your roads and satisfy regulatory requirements.
Ducting and Cabling Installation
Underground utility infrastructure installed efficiently, with proper reinstatement that won’t cause problems later.
Highway Drainage Solutions
Drainage solutions that satisfy planners, meet SuDS requirements, and protect your site from water problems.
Project enabling works
Get your site ready for construction with expert groundwork that prevents delays and costly discoveries.
Tennis Courts & Sport surfacing
Sports surfaces that meet official playing standards and deliver consistent performance season after season.
Winter Maintenance and Gritting
Stay operational through winter with prompt gritting and clearance that keeps your sites safe.
Signage & Road Marking Installation
Clear, compliant markings and signage that guide traffic safely and meet regulatory requirements.
Pothole & Pavement Repairs
Rapid response repairs that fix hazards properly, protecting users and reducing your ongoing liability.
Highways Maintenance
Keep your network safe and serviceable with responsive maintenance from an NHSS-accredited contractor.
Car Park Surfacing
Car parks engineered for heavy commercial use, built to adoption standards that pass inspection first time.
Traffic Management (Temporary & Permanent)
Safe, compliant traffic control that satisfies highway authorities and keeps your programme running to schedule.
Bridge & Barrier Repairs
Protect your infrastructure investment with expert repairs that restore safety and extend operational lifespan.
Backlog Defect Resolution
WITH OVER 30,000 UN-ADOPTED SITES ACROSS THE UK...
HighwaysPus has developed our Adoption Management System to support developers with any backlog schemes they still have on their books.
Our key aim is to provide our clients with a ‘lump sum, fixed fee’ quotation to secure maintenance/adoption of each scheme, including all required technical, legal, consultancy and remedial works. We are specialists in the adoption/vesting of highways (section 38, 278 or 111), sewers (Section 102, 104 or 185), Pump Stations and Public Open Space.
Our process
Stage 1: Initial update (Desk-based review)
Highways+ undertake a 'free of charge' desk-based review and report including:
- Review of information provided by client.
- Initial contact with Adopting Authority to check status from their records.
- Production of email report containing findings and recommendations to proceed with the adoption.
- Quotation to undertake an essential Investigation Works
Stage 2: Investigation works
Highway+ undertake any essential site investigations works (site specific) and review all technical, consultancy and legal requirements to secure adoption. Upon completion of the investigation works, we issue our client with a detailed Adoption Solution Report. These works may include:
- Liaison with the Adopting Authority
- Conduct visual inspections of highways alongside the Adopting Authority
- Undertake visual inspection of Manholes with Council or Water Company (highway drainage or Section 104)
- CCTV survey of sewers street testing provision of NICEIC certificates.
- Core samples or trial pits in highways, as-built surveys.
- Review legals inc. sewer and WAF easements, service verge issues etc.
- Review status of agreements, technical approval, and engrossments Design amendments and CAD work.
- Review all technical and legal requirements
Stage 3: Remedial, technical and legal works
Item remedial works:
- Manhole remedials and sewer length excavations.
- Pump stations works.
- Specialist sewers lining.
- Highways remedials and final surfacing.
- Street lighting works.
- Service diversions and utility works.
- Water box works.
Technical and consultancy:
- Liaison with Adopting Authority and coordination of interim inspections.
- Resident liaison throughout project.
- Site surveys and drawings
- Support with agreements (104, 102, 185, 38, 37, 278, 111)
- Production of adoption documentation (CDM file, PS manuals etc)
- Health and safety reviews.
Legal works:
- Managing legal works including 3rd party liaison.
- Internal Solicitor.
- New and retrospective Easements.
- Land transfer and conveyancing.
- Service verge issues.
Stage 4: Technical admin and obtaining certificate
- Liaison with Adopting Authority.
- Any outstanding technical works.
- Produce site inventory (as required)
- Obtain Maintenance or Adoption Certificate